Manufacturer: Flexi - USA
23' Foot Long Lead: Wholesale Products
(0 votes)
Product description:The Extra Long Retractable Cord Leashes Retractable cord/ribbon leashes with a comfortable one-hand braking system Maximum length of 23 ft. Small for dogs up to approx. 26 lbs. Medium for dogs up to approx. 44 lbs. Large for dogs up to approx. 110 lbs.
Categories:
If you want to be able to order this product, please login to your account
Manufacturer: Flexi - USA
Order terms
- Typical delivery time frame: 5 days
- Opening Order Minimum: $150.00
- Re-Order Minimum: $150.00
- Free Shipping: No
- Terms Offered (upon approval): No
- Credit Card: MasterCard; Visa; American Express; Discover;
- Upon Credit Approval: ;
This product has no reviews. Be the first to write a rating review